kel.GIF (24064 bytes)  kel2.jpg (32498 bytes)
 

Cick on underlined text below to view that page

HOME

TRAINING

PLACEMENT_SERVICES

QUALITY_SERVICES


Manufacturing Services Offered

Cycle Time and Lead Time Reduction; Inventory Reduction; Cost Control; Quality Improvement; Factory Layout Design; Delivery Performance Improvement; Set-up/Changeover Time Reduction; Kaizen Events; Cash Generation and Floor Space utilisation Through Inventory Reduction; Strategic Planning Facilitation.

Brief Description Of Service

AKK Associates is a hands-on group was formed in 1993 with the sole purpose of helping companies achieve dramatic, tangible results in short time periods. What resulted was a powerful process, which actually synergises the rapid transformation of traditional manufacturers to World Class Manufacturing.

Industries Served

Most Industries
Manufacturers
Retail / Distributor
Healthcare / Medical
Non - Profit / Professional Bodies

Areas of Key Competence

Just In TimeCycle Time Reduction

World Class Manufacturing

Lean Manufacturing

Pull System

Demand Flow Technology

Continuous Flow Manufacturing

Flexible Manufacturing

CELLULAR MANUFACTURING

Hitech1.jpg (16421 bytes)        Hitech2.jpg (17575 bytes)

PIC1                                           PIC2

These pictures shows two views of a Manufacturing Plant designed & set-up by us for manufacturing a Sheet Metal Fabricated Systems using World Class Manufacturing techniques. Pic 1 shows a panoramic view of two cells. Notice there is absolutely no Work In Progress inventory. Pic 2 shows how it is done using Cellular Manufacturing & Single Piece Flow techniques. Single Piece Flow is made possible by a technique called Set-Up Reduction or Quick Change Over. This Plant has very little total inventory, in the form of Raw Material & Finished Goods, with little or no Work In Progress inventory. Their manufacturing lead times are extremely small and the cells are extremely flexible.

Cellular Layout

Visual factory

Set Up Reduction / SMED / QCO

Supply Chain Management

JIT Supplier / Supplier Partnering

Inventory Reduction

On Time Delivery

Kanban

SET-UP REDUCTION

Rdl1.jpg (14410 bytes)      

PIC1                                           PIC2

Pic 1 shows a Set-Up Reduction project in progress, the operator is explaining a point to rest of the team, while Pic 2 shows the Class Room session which preceded the Practical Shop Floor practical session. This project reduced the initial set-up time from the previous 6 hours to 30 minutes, in three stages. Pic 1 & 2 were taken during stage 1 of the implementation Program.

Total Quality Management

Quality Function Deployment

Fail Safe / Fool Proofing / Poka Yoke

ISO 9000 / Quality System

INVENTORY REDUCTION PROJECTS

Exp1.jpg (17710 bytes) Exp2.jpg (22213 bytes)

PIC1                                  PIC2                                  PIC3

Racks & Racks of Precut Plastic Sleeves Pic 1 which were prepared by a sizeable Casual Work Force, were eliminated by positioning a worker directly supplying to the Packing Line. Eliminating both the sizeable casual work force and inventory. Pic 2 shows before and Pic 3 shows after the improvement. Casual Labourers saved 4. Work In Process Inventory saved upto 95%.      

Placement Services

Kaizen

Total Employee Involvement

Employee Empowerment

Small Group Activities

Team & Working Together as Teams

Quality Circles

QUALITY IMPROVEMENT PROJECTS

San1.jpg (24026 bytes)      San2.jpg (25158 bytes)

PIC1                                                PIC2

Pic2 showed the frequent rework which used to be done in a large structural workshop, this was reduced through tooling. Pic 1 shows one of our facilitator examining a ingenious jig which eliminated reworks and was able to accommodate a large no of similar structural products. Earlier it was left to the skill of the structural fitter to assemble the various members before welding. Time saved by this jig amounted to about 80% of the original time.

       email: anupkelkar@vsnl.com