BASIC  INFRASTRUCTURE

1.

Employees:

(a) Gazetted

53

(b)  Non-gazetted

12305

2.

Area of Workshop

0.61 Sq.KM.

3.

Total covered Workshop area. 0.28 Sq.KM.

4.

Rail track length within W/Shop 94.5 Kilometres

5.

Total road length inside W/Shop 11 Kilometres

6.

M&P installed 1189

7.

Average requirement of Elec. Power 619161 KWH per month.

8.

Availability of standby power            4 DG Sets  of 1750 KW each.

9.

Total staff provided with housing 4810

10.

Budget (Approx. in Crores of Rs.) 425 (Mfg. Suspense)
225 (Revenue)